What is the best way to schedule construction projects?

The most widely used scheduling technique is the critical path method (CPM) for scheduling, often referred to as critical path scheduling. This method calculates the minimum completion time for a project along with the possible start and finish times for the project activities.

Leave a Reply

Your email address will not be published. Required fields are marked *